Utilisation and Reliability of High Power Proton Accelerators [E-Book]: Workshop Proceedings, Santa Fe, New Mexico, USA, 12-16 May 2002 / Organisation for Economic Co-operation and Development and NEA
R&D activities and construction plans related to high power proton accelerators are being considered in various countries to promote basic and applied sciences. Both accelerator scientists and reactor physicists gathered at an NEA workshop to discuss the reliability of the accelerator; spallatio...
Saved in:
Full text |
|
Imprint: |
Paris :
OECD Publishing,
2003
|
Physical Description: |
436 p. ; 20x27cm. |
Note: |
englisch |
ISBN: |
9789264102125 |
DOI: |
10.1787/9789264102125-en |
Series Title: |
/* Depending on the record driver, $field may either be an array with
"name" and "number" keys or a flat string containing only the series
name. We should account for both cases to maximize compatibility. */?>
Nuclear Science
|
Keywords: |
Mexico Nuclear Energy |
- Foreword
- Executive Summary
- Session I. Opening
- The European Programme by B. Carluec, H. Ait Abderahim, and A. C. Mueller
- Korean R&D Programme for HPPA by w. s. Park, Y. S. Cho, and B. H.Choi
- The US Advanced Accelerator Applications Programme by F. Goldner
- Reliable Linac Design for Accelerator-Driven Subcritical Reactor Systems by T. P. Wangler
- Reliable Cyclotron Design by Th. Stammback, S. Adam, A. Mezger, P. Sigg, and P. A. Schmelzbach
- Towards Reliable High Power Spallation Target Designs by G. S. Bauer
- The Demonstration of the ADS concept by M. Salvatores, A. D'Angelo, and d. Naberejnev
- The Mechanical Properties of 316L/304L Stainless Steels, Alloy 718, and Mod 9Cr-1Mo after Irradiation in a Spallation Environment by S. A. Maloy, M. R. James, G. Willcutt, S. F. Sommer, M. Sokolov, L. L. Snead, M. L. Hamilton, and F. Garner
- Session II. Accelerator, Target-Window/Materials and Multiplier
- Reliability Tests of the High-Power Proton Source SILHI at CEA/Saclay by R. Gobin, P.-Y. Beauvais, D. Bogard, R. Ferdinand, and P. Mattei
- Operational Experience with a 352 MHz 5-Cell Accelerating Structure for the High Energy Section of the TRASCO Linac by E. Chiaveri, R. Losito, S. Calatroni, R. Ballantini, A. Chincarini, G. Gemme, R. Parodi, D. Barni, A. Bosotti, C. Pagani, and P. Pierini
- Beam Reliability and Equipment Downtime Tracking - How LANSCE Closes the Loop by N. t. Callaway and R. D. Ryder
- Comments to Accelerator-Driven System by T. Masumoto
- R&D Status of Super-Conducting Proton Linac and the KEK-JAERI High Intensity Proton Accelerator Project by N. Ouchi
- The Use of NEG Vacuum Pumps on the LEDA RFQ by R. Valdiviez, D. Schrage, S. Shen, and K. Kishiyama
- Corrosion Measurement on APT Prototypic Materials in the LANSCE High Power Proton Beam and Applicability to Other Systems by R. S. Lillard, G. T. Chandler, P. D. Ferguson, F. D.Gac, M. R. James, S. A. Maloy, M. A. Paciotti, L. S. Waters, and G. J. Willcutt
- Preliminary Measurements from a Thick Lead-Bismuth Target Using 800 MeV Protons by M. R. James, R. T. Klann, G. L. Morgan, E. J. Pitcher, M. A. Paciotti, J. M. Oostens
- Gas Production Cross-Section Measurements at LANSCE by R. C. Haight and M. Devlin
- Thermal-Hydraulic Design Analysis of a 5 MW Sodium-Cooled Tungsten Target by X. Cheng, P. J. Finck, J. Roglans-ribas, and T. Schulenberg
- Session III. Test Facilities and Control/Safety/Shutdown
- Safety Analysis of Na and Pb-Bi Coolants in Response to Beam Instabilities by M. Eriksson, J. Wallenius, J. E. Cahalan, K. Tucek, and W. Gudowski
- Active and Passive Safety Control Performance in Subcritical, Accelerator-Driven Nuclear Reactors by J. E. Cahalan and M. Eriksson
- Operating Requirements for a Proton-Beam Accelerator to Couple with a Subcritical System by A. Negrini and G. Proto
- Safe Shutdown of accelerator-Driven Systems by B. E. Boyack M. W. Cappiello, and K. O. Pasamehmetoglu
- Theoretical and Experimental Evaluation of the Windowless Interface for the TRASCO-ADS Project by D. Barni, P. NMichelato, d. Sertore, A. Bonucci, R. Giannantonio, P. Turroni, and L. Cinotti
- Design and Verification Experiments for the Windowless Spallation Target of the ADS Prototype MYRRHA by K. van Tichelen, P. Kupschus, B. Arien, and H. Ait Abderrahim
- Radioprotection Calculations for the TRADE Experiment by L. Zanini, A. Ferrari, a. Herrera-Martinez, Y. Kadi, C. Rubbia, N. Burgio, M. Carta, A. Santagata, and L. Cinotti
- Thermal Response of the Multiplier of an Accelerator-Driven System to Beam Interruptions by F. E. Dunn
- Accelerator-Driven Test Facility: Modular Target and Multiplier System Concept Design Description by M. Cappiello, K. Pasamehmetoglu, E. Pitcher, R. Guffee, W. Chaves, and G. Willcutt
- Lead-Bismuth Spallation Target Design of the Accelerator-Driven Test Facility (ADTF) by Y. Gohar, P. Finck, A. Hanson, J. Herceg, M. Koploy, L. Krajitl, Pl Mijatovic, W. D. Pointer, J. Saiveau, T. Sofu, and M. Todosow
- Results from the Initial Operation of the LANL DELTA Loop by V. Tcharnotskaia, C. Ammerman, and K. Woloshun
- Summaries of Discussion Sessions
- Summary of Working Group Discussion on Design Considerations, Reliability Performance, and Requirements for the Accelerator by M. Cappiello, Chair
- Summary of Working Group Discussions on Accelerators by Carlo Pagani and P. Colestock, Chairs
- Summary of Working Group Discussion on Multiplier by E. Pitcher and E. Gonzalez, Chairs
- Summary of Working Group Discussion on Target Technology by K. Pasemehmetoglu and G. Laffont, Chairs
- Summary of Working Group Discussion on Control/Safety/Shudown by M. Cappiello, Chair
- Summary of Final Working Group Discussion by K. Pasemehmetoglu, Chair